[su_heading size=”18″]IPPTS Associates Role:[/su_heading]
General waste management expert, and composting process design
Developed the process design and provided engineering advice, to Glonet Consultants, for the feasibility studies for two large In-vessel MSW Composting Facilities planned for two municipalities in India. Estimated at £15 Million to £19 Million construction cost.
DSEAR Risk Assessment for a Waste Treatment Facility Located on a Capped Landfill
DSEAR Risk Assessment Service DSEAR Risk Assessment and Explosion Protection Document provided for a waste processing facility located above a capped, but large and deep heavily gassing landfill in Wales. Features: Site visit with in-depth interview of facility operatives to scope the potential landfill gas health and safety risks Production of risk assessment table with […]
Case Study 8: Leachate Pollution Environmental Compliance – Water Chemistry Expert Service
[su_heading size=”18″]IPPTS Associates Role:[/su_heading] Leachate Water Chemistry Expert Client in East Anglia, UK. Reporting, remedial works inspection, and regulatory authority liaison in connection with a problem with environmental emissions compliance including independent advice on water quality sampling data interpretation after a pollution incident in connection with an anaerobic digestion facility (biogas plant). Worked to repair […]
Methane Stripping from Landfill Leachate: A Case Study
For this case study on Methane Stripping from Landfill Leachate, IPPTS Associates’ role was to act as the leachate expert for a centralized methane stripping facility to serve 4 landfills in the counties of Yorkshire and Derbyshire. Duties were to design a methane stripping plant (MSP) in outline, write up the technical specs, and procure […]
Case Study 5: Leachate Treatment for New Landfill in Vietnam
[su_heading size=”18″]IPPTS Associates Role:[/su_heading] Leachate Expert Nha Trang Landfill Project: Completed a leachate treatment and disposal options study, drafted the technical specifications and provided a full report on the preferred treatment process and disposal option, for the landfill owner which was the Regional Government. Preferred treatment was Extended Aeration SBR to sewer, after review of […]
You must be logged in to post a comment.