Nha Trang landfill vietnam leachate treatment

Case Study 5: Leachate Treatment for New Landfill in Vietnam

[su_heading size=”18″]IPPTS Associates Role:[/su_heading]
Leachate Expert

Nha Trang landfill vietnam leachate treatment
Nha Trang Landfill Project: Completed a leachate treatment and disposal options study, drafted the technical specifications and provided a full report on the preferred treatment process and disposal option, for the landfill owner which was the Regional Government. Preferred treatment was Extended Aeration SBR to sewer, after review of the Reverse Osmosis alternative showed Biological SBR Treatment option would be lower cost and allow appropriate technology to be locally resourced, operated, and maintained.


You May Also Like These Topics...
Waste Management DSEAR Risk Assessment case study

DSEAR Risk Assessment for a Waste Treatment Facility Located on a Capped Landfill

DSEAR Risk Assessment Service DSEAR Risk Assessment and Explosion Protection Document provided for a waste processing facility located above a capped, but large and deep heavily gassing landfill in Wales. Features: Site visit with in-depth interview of facility operatives to scope the potential landfill gas health and safety risks Production of risk assessment table with […]

leachate pollution incident environmental emissions compliance advice

Case Study 8: Leachate Pollution Environmental Compliance – Water Chemistry Expert Service

[su_heading size=”18″]IPPTS Associates Role:[/su_heading] Leachate Water Chemistry Expert Client in East Anglia, UK. Reporting, remedial works inspection, and regulatory authority liaison in connection with a problem with environmental emissions compliance including independent advice on water quality sampling data interpretation after a pollution incident in connection with an anaerobic digestion facility (biogas plant). Worked to repair […]

in-vessel composting case study environmental waste processing

Case Study 7: In-Vessel Composting Facility Design

[su_heading size=”18″]IPPTS Associates Role:[/su_heading] General waste management expert, and composting process design Developed the process design and provided engineering advice, to Glonet Consultants, for the feasibility studies for two large In-vessel MSW Composting Facilities planned for two municipalities in India. Estimated at £15 Million to £19 Million construction cost.

Leachate storage tank environmental compliance consultant

Methane Stripping from Landfill Leachate: A Case Study

For this case study on Methane Stripping from Landfill Leachate, IPPTS Associates’ role was to act as the leachate expert for a centralized methane stripping facility to serve 4 landfills in the counties of Yorkshire and Derbyshire. Duties were to design a methane stripping plant (MSP) in outline, write up the technical specs, and procure […]

Tags: , , ,
Previous Post
Leachate storage tank environmental compliance consultant
Case Studies of IPPTS Associates Consultancy Projects

Methane Stripping from Landfill Leachate: A Case Study

Next Post
Leachate environmental compliance options
Case Studies of IPPTS Associates Consultancy Projects

Effective Leachate Management for Environmental Compliance

0 Shares
Tweet
Pin
Share
Share
Share