Waste Management DSEAR Risk Assessment case study

In Vessel Composting Design

IPPTS Associates Role: DSEAR Risk Assessment Service

Waste Management DSEAR Risk Assessment case study

Project Details: An initial DSEAR Risk Assessment and the resulting Explosion Protection Document was provided by IPPTS Associates as a sub-consultant, for a soil waste processing facility located above a capped gassing landfill, a large and deep heavily gassing landfill in South Wales.

We recommended that the report be reviewed once every 3 years, and so far we have completed 3 reports through repeat work.

Case Study Features:

  • Site visit with in-depth interview of facility operatives to scope the potential landfill gas health and safety risks
  • Production of risk assessment table with risk quantification scoring
  • Production of Explosion Protection Document report on recommended actions to achieve compliance with the UK DSEAR regulations
  • Client feedback resulting in corrective action resulting in completion of the agreed compliance actions for full DSEA Regulations compliance.

Result of DSEA regulations compliant soil washing

Tags: , , ,
Previous Post
Sustainable Water Treatment - 5 Best Practices
General

Sustainable Water Treatment: 5 Best Practices and Innovations for Engineers and Technicians

Next Post
leachate pollution incident environmental emissions compliance advice
Case Studies of IPPTS Associates Consultancy Projects

Case Study 8: Leachate Pollution Environmental Compliance – Water Chemistry Expert Service

0 Shares
Tweet
Pin
Share
Share
Share